Consultant for the "Housing Improvement Study"

PHU NU

Housing Improvement Study


Introduction

The project Improvement of working and living conditions of migrant women workers through empowerment and a right based approach (PHU NU 2) has the overall objective of contributing to the improvement of the living and working conditions of migrant women workers in the industrial zones of Vietnam by developing their capacities to negotiate and to advocate for the respect of their rights in a favorable multi-actors environment. The project is funded mainly by AFD (French Development Agency) and Foundation Abbe Pierre, and implemented by a consortium of 3 NGOs, namely Batik International, GRET and Center for Development Integration (CDI)

Specific objectives of the project are as followed:

SO 1:  Reinforce the capacity to act and choose of the women leaders to conceive and defend collective proposals for the respect, the protection and the implementation of their social rights.

SO 2: Improve the living conditions of migrant women in 20 common housing areas in the industrial zones of Vinh Phuc and Hai Duong, through dialogue and consultation of stakeholders (social actors, political actors, and landlords).

SO 3: Improve the working conditions of migrant women workers in 6 companies of the industrial zones of Vinh Phuc and Hai Duong, through dialogue and consultations (companies, legal actors, trade union actors).

Objectives and Scope of activity:

A block fund will be dedicated to finance housing improvement in both suburban areas of Hai Duong and Vinh Phuc with the aim of improving the living conditions of migrant women workers and offer meeting spaces to reinforce the collective dynamics of women’s clubs. Women’s clubs have been created during the first phase of the project. Members are some of the residents of the housing areas where the club is set, and they meet regularly to discuss on several themes related to their living and working conditions. They also receive trainings during these sessions from members of relevant public services operating in their provinces.

Following the success of a similar activity regarding living conditions’s improvement works in Phase 1 (2014 – 2017), works are expected to create not only a lasting and visible impact on the migrant women workers’ daily life but also a strong asset for the cooperation between the Project and the owners of the common housing areas. This fund is to be managed by Batik International.

A qualified external consultant will carry out a study and identify the priorities in the works to be conducted to answer women’s needs. The study will take into account the technical aspects and constraints of the works, as well as the maintenance. It will be conducted in a participatory manner with women workers and landlords, so as to favor the ownership and maintenance of the spaces after the works. The works will have to address individual needs (improvement of the insulation of the rooms, of the water and sanitation infrastructure, of the security of the room) and collective needs (such as waste management, improvement of common toilets and showers). Notably, the collective spaces are considered as a priority for this component as it will create or improve the spaces for the process of socialisation and awareness rising of the migrant workers living in two industrial zones in Hai Duong and Vinh Phuc. The external consultant will be recruited to accompany the project over the 3 years of its implementation. He/She will conduct the following tasks:  

Year 1

Meeting with the project team to establish a precise framework of the study and its expected outcomes.

Work with the project team to carry out a desk review analysis about the living conditions (the houses) of the women at the 2 industrial zones through information on housing improvement works in Phase 1

Design and conduct a diagnosis survey (including field visit, meetings with local partners and meetings with club members) in the 2 targeted areas.

Provide solutions/suggestions to improve the 27 housing areas with a detailed quotation for works that need to be improved

Write a first report on agreed improvement works for each housing area with an estimated quotation

Participate with Batik International and local partners in meetings with landlords to discuss and agree on necessary improvements

Year 2

In collaboration with Batik International and local partners, conduct an evaluation on completed improvement works

Write a final report (maximum 20 pages) to evaluate the completed improvement works and their impact on migrant workers’ daily lives.

 

Expected outcomes

Year 1

Desk review analysis about living conditions, to be included with Year 1 Report.

Diagnosis survey and findings of the survey

First report identifying the improvement works in at least 25 housing areas, with specific prices and estimated quotations.

Year 2

Evaluation report of conducted works

Final report evaluating the works conducted and their impact on migrant workers’ lives. (Maximum 20 pages)

 

Role of Partners   

BATIK International, CDI and GRET work on the field with local partners: the Labour Union in Hai Duong and the Labour Union and the Women’s Union in Vinh Phuc. These partners, together with Batik International in-charge staff, implement the activities on the field and provide the project’s team with a constant support to contact local stakeholders and to reach the beneficiaries. The consultant team will coordinate directly with Batik International’s team for the organization of their visits on the field. The field trip will be conducted with the presence of local partners, Batik International in-charge staff and the members of the consultant team. Gret and CDI could provide support upon request from Batik International regarding the arrangement of clubs’ meetings for the participatory assessment of the consultant team. In a word, Batik International is the lead organization in this activity, and is in charge of the main support and coordination of the work’s implementation.

Methodology

Types of activities

Description

No of Working Days

Notes

Meeting with BATIK Int Team

Discuss on objectives, content and agenda of the activity

0.5 Day

In Hanoi

Desk Study

Study the meetings’ minutes, reports of the projects regarding the improvement of living conditions

2 Days

In Hanoi

Detailed Field Trip Plan

Elaborate a detailed field trip plan and send to BATIK Int for approval

0,5 Days

In Hanoi

Develop a survey framework to collect migrant women workers’ claims and wishes

In order to collect the claims of residents of the housing areas, a survey must be created. It will be administered by BATIK Int’s team.

2 Days

In Hanoi

Field Trip

3 Days in Vinh Phuc and 2 in Hai Duong to identify improvements of housing areas

5 Days

In Vinh Phuc and Hai Duong

First Draft of Improvements Report

Based on the field trips and on claims collected through the survey, establish a first draft of improvements that could be conducted in each housing area, with tentative costs.

3 Days

In Hanoi

Participate in the meeting with the landlords where we present the findings of the study

One meeting in each province to present the findings and collect remarks and claims from the landlords

2 Half-Days

In Vinh Phuc and Hai Duong

Final Report of the Study

Including input and remarks from the landlords and comments from the project’s team

2 Days

In Hanoi

Supervision of the works on the field

3 Days in Vinh Phuc and 2 in Hai Duong to monitor the improvement process

5 Days

In Vinh Phuc and Hai Duong

Evaluate the works conducted in the housing areas

3 Days in Vinh Phuc and 2 in Hai Duong to evaluate the quality of the works and the respect of the initial study

5 Days

In Vinh Phuc and Hai Duong

Final Evaluation Report

Produce a report on the works to evaluate the respect of the initial study’s recommendations and the quality of the works

2 Days

In Hanoi

Total of Days

28 Days

 

 

Calendar

Task

Date

Meeting with BATIK Int Team

August 14th

Desk Study

Before August 18th

Detailed Field Trip Plan

Before August 18th

Develop a survey framework to collect migrant women workers claims and wishes

Before August 25th

Field Trip

From August 28th to September 8th

First Draft of Improvements Report

Before September 15th

Participate in presentation of the findings of the study meeting with landlords

From September 25th to October 6th

Final Report of the Study

Before October 13th

Construction supervision

Tentative: Fall/Winter 2018

Evaluate the works conducted in the housing areas

Tentative : Fall/Winter 2018

Final Evaluation Report

Tentative : Fall/Winter 2018

 

Budget

Phu Nu’s project budget for this study is of 200.000.000 VND (Two hundreds millions Vietnamese Dongs), including expenses of per diems, travel costs, fees and other necessary tools and equipment. As per Vietnamese Law, the contract will use Vietnamese Dongs for all sums.

Changes in the TOR

The present Terms of Reference could be modified later on depending on the needs encountered by the project’s team.

Answers Requirements and Contact Details

Consultants interested by this offer must provide:

  • Previous studies conducted in a similar and/or related field

  • CV of the members of the consultant team

  • Extracts of relevant studies if possible

  • A detailed proposal for the study (including detailed activities and estimated budget)

All candidacies must be sent to [email protected] and [email protected] before Sunday, September 10th 2017

Job Details
Organisation Name: 
Batik International
Application Deadline: 
Sun, 2017-09-10